Complex use of recovered heat to increase the efficiency of gas-fired boilers

The work of complex heat-recovery systems using water-hiting and air-heating heat-recovery exchangers was investigated. The combined use recovered heat to heat the return heat-network water, water of chemical water-purification system or combustion air.

Рубрика Производство и технологии
Вид статья
Язык английский
Дата добавления 22.04.2021
Размер файла 264,3 K

Отправить свою хорошую работу в базу знаний просто. Используйте форму, расположенную ниже

Студенты, аспиранты, молодые ученые, использующие базу знаний в своей учебе и работе, будут вам очень благодарны.

Размещено на http://www.allbest.ru/

Complex use of recovered heat to increase the efficiency of gas-fired boilers

Fialko Nataliia

Doctor of Technical Sciences, Professor,

Corresponding Member of NAS of Ukraine,

Honored Worker of Science and Technology of Ukraine,

Department Head

Institute of Engineering Thermophysics of

National Academy of Sciences of Ukraine

Summary

The work of complex heat-recovery systems using water-hiting and air-heating heat-recovery exchangers was investigated. The combined use of recovered heat to heat the return heat-network water, water of chemical water-purification system or combustion air will provide condensation mode of heat-recovery equipment throughout the all heating season. This will lead to a significant increase in the thermal capacity of the boiler plant and corresponding to save fuel.

Key words: heat recovery, exhaust-gases, condensation mode, coefficient the use heat of fuel of boiler.

One of the areas of energy conservation in power engineering is to increase the efficiency of fuel use in boilers through the deep recovery of the heat of exhaust - gases. Traditional heat-recovery technologies, in which only the return heat-network water is heated, provide cooling of flue-gases to a temperature of 70-80 °C. This temperature level of flue-gases corresponds to an increase in boiler efficiency by approximately 2-4 %.

For a greater increase in boiler efficiency or the coefficient the use heat of fuel of boiler (CUHF), it is necessary to ensure the mode of deep heat-recovery of exhaust-gases throughout the entire heating period. For this purpose, it is necessary to use an additional heat exchanger in which the heated heat-transfer agent has a lower temperature than the return water of the boiler. This heat-transfer agent can be cold water that enters the chemical water-purification system, or combustion air. In this case, in the heat-recovery installation will be carried out the complex use of heat to heat two heat-transfer agents with different temperature potentials [1-3]. In fig. 1, 2 as an example, the schemes of boiler plants with the specified combination. So, in the scheme (Fig. 1), an installation with an additional second heat exchanger for heating the water of the chemical water-purification system (CWPS) is proposed. The scheme in fig. 2 corresponds to the combination of hot water and air heat exchangers. In this scheme, the water heater is located in front of the heater along the way exhaust-gases. In this case, all the recovered heat is used in the boiler: for heating the return water and the combustion air. The specified combination of heat exchangers will provide condensation operation of the heat-recovery equipment throughout the heating season, because in the coldest period of the year, the deep heat-recovery of gases can be achieved through cold air, and in the spring period by reducing the temperature of the return heat-network water.

In fig. 3 shows the results of calculations of the level of efficiency increase (CUHF) Др of the boiler for two options for using the recovered heat, namely: only for the needs of the boiler and with the combined use of heat. The calculations were made for the following conditions: the heat-exchange surface of these heat exchangers consists of finned bimetallic pipes (steel base and aluminum fins), the calculated environment air temperature of the heating system is tЈ = -20 °C, its temperature difference ДТ = 70-115 °C, water consumption on the CWPS meets the standards of feed (1.5 % of the water consumption to the boiler), the initial temperature of the raw water is 5 °C, the final temperature is 30-40 °C.

As can be seen from the obtained results, the combination of heat exchangers can provide deeper cooling of exhaust-gases and an increase in CUHF of the boiler plant during the heating period by 6-10 0%, and when using reclaimed heat only for heating the return heat-network water, the boiler efficiency increases by 4.2-6 0%

In fig. 4 shows the results of computational studies of the levels of increase in boiler efficiency when combining water and air heating heat exchangers. The results show that the use of an air heat exchanger (in particular of a panel type) for additional cooling of exhaust-gases (see Fig. 2) provides an additional increase in boiler efficiency by 1-2.2 % compared to using only a heat exchanger for heating return heat-network water, which correspond to the data of Fig.3. However, at the same time, the heat exchange surface of the air heater is more than 2 times greater than the heat exchange surface of the water heat exchanger. The further increase in boiler efficiency is associated with a more significant increase in the dimensions of the air heat exchanger.

Fig. 1. Schematic circuit of the heat-recovery installation with the complex use of two hot-water heat exchangers: 1 -- boiler; 2 -- heater of return heat-network water; 3 -- raw water heater; 4 -- exhaust-gas heater; 5 -- chimney; 6 -- exhauster

Fig. 2. Schematic circuit of the heat-recovery installation with the complex use of water and combustion air heat exchangers: 1 -- boiler; 2 -- heater of return heat-network water; 3 -- combustion air heater; 4 -- exhaust-gas heater; 5 -- chimney; 6 -- exhauster; 7 -- blower

Fig. 3. Dependence on environmental temperature te the level to increase efficiency (CUHF) boiler An using recovery-heat for heating return water (1), raw water to the CWPS (2) and the complex use of heat (3)

heat gas fired boilers

In both proposed heat-recovery circuits (see fig. 1, 2), thermal protection of the exhaust-ducts (installa-tion of the exhaust-gas preheater) against condensate formation is provided.

According to the estimates, the payback period for the introduction of heat-recovery plants with two water-heating heat exchangers does not exceed 1.5 years, and when combining water- and air-heating heat exchangers -- 2 years.

Fig. 4. Dependence on environ-mental temperature te the level to increase efficiency boiler An using recovery-heat for heating return water (1), combustion air (2) and the complex use of heat (3)

Conclusions

1. The applying of the complex use of recovered heat to heat the return heat-network water and the raw water for the chemical water-purification system (or combustion air) can provide an increase in boiler efficiency (CUHF) by 6-10 %.

2. The complex use of water heat exchangers is preferable to the combined use of water and air heat exchangers due to the significant dimensions of the latter.

References

1. Fialko, N. M., Navrodskaya, R. A., Gnedash, G. A., Presich, G. A., & Stepanova, A. I. (2014). Increasing the ef-ficiency of boiler plants of communal heat energy by combining the heat of the exhaust-gases. International Scientific Journal” Alternative Energy and Ecology, (15), 126-129.

2. Fialko, N. M., Presich, G. A., Navrodskaya, R. A., & Gnedash, G. A. (2011). Udoskonalennia kompleksnoi systemy utylizatsii teploty vidkhidnykh haziv kotloahrehativ dlia pidihrivannia i zvolozhennia duttovoho povitria [Improvement of the complex heat-recovery system of exhaust-gases of boilers for heating and humidifying blown air]. Promyshlennaia teplotekhnika [Industrial Heat Engineering], 33(5), 88-95.

3. Navrodskaya, R. A., Fialko, N. M., Gnedash, G. A., & Sbrodova, G. A. (2017). Energy-efficient heat recovery sys-tem for heating the backward heating system water and blast air of municipal boilers.Thermophysics and Thermal Power Engineering, 39(4), 69-75.

Размещено на Allbest.ru


Подобные документы

  • General structure of a river petroleum storage depot. Calculation of reservoirs capacity for fuel storage, selecting of reservoirs type, its equipment. Selection of fuel purification means. Equipment for fuel distributing and distributing process itself.

    контрольная работа [4,7 M], добавлен 17.11.2014

  • Thermit Welding is not a common process. The process consists of a chemical reaction obtained by igniting finely divided aluminium and iron oxide. The temperature of the molten metal. Electric, spot and flash Welding. Projection Welding Electrodes.

    презентация [3,5 M], добавлен 17.12.2009

  • Технологічний процес роботи автоматичної установки для сушіння вологого матеріалу сільськогосподарського призначення – бурячного жому. Застосування логічного мікропроцесорного контролера VIPA SYSTEM 200V, контури контролю та регулювання процесів.

    курсовая работа [1,7 M], добавлен 07.12.2011

  • Методы защиты окружающей среды от опасных техногенных воздействий промышленности на экосистемы. Структура и функциональные особенности автоматизированной системы контроля окружающей среды, принципы ее эксплуатации. Робот-медуза Oceanic Cleaning System.

    реферат [186,3 K], добавлен 30.03.2014

  • Описание технологического процесса фракционирования углеводородного сырья. Схема дисцилляции — фракционирования нефти. Регулирование уровня мазута в кубе ректификационной колонны. Обработка массива данных с помощью пакета System Identification Toolbox.

    курсовая работа [2,4 M], добавлен 28.05.2015

  • Расчет и конструирование двигателя, выбор главных размеров, расчет обмотки статора. Расчет размеров зубцовой зоны статора и выбор воздушного зазора. Моделирование двигателя в среде MatLab Power System Blockset а также с параметрами номинального режима.

    курсовая работа [331,3 K], добавлен 25.09.2009

  • Definition the certain latent high temperature of evaporation of the liquid using capital equipment and calculations. The accepted value of the latent high temperature of evaporation. The uncertainty for the specific latent heat of vaporization.

    лабораторная работа [247,8 K], добавлен 29.12.2010

  • General characteristics of antibiotics. Production of penicillin, statement of the process. Fermentation, filtering, pre-treatment of native solution. Extraction, purification of penicillin, isolation of crystalline salts. The thermal properties of air.

    курсовая работа [851,9 K], добавлен 01.11.2013

  • Water - the beauty of nature. Description of several ways to determine if good water you drink or not. The study of the quality of bottled water producing in Ukraine. The definition of bottled water given by the International Bottled Water Association.

    презентация [2,0 M], добавлен 21.05.2013

  • The physiological, hygienic and epidemiological value of water. Diseases associated with water factor. Measures to prevent transmission of infectious diseases through the water. Influence of biological factors on survival of microorganisms in water.

    презентация [762,9 K], добавлен 17.05.2016

Работы в архивах красиво оформлены согласно требованиям ВУЗов и содержат рисунки, диаграммы, формулы и т.д.
PPT, PPTX и PDF-файлы представлены только в архивах.
Рекомендуем скачать работу.