Local Government Staff Performance Management in Tanzania: Experience of Open Performance Review and Appraisal System (OPRAS) in Kinondoni Municipal Council

Evaluating the effectiveness of introducing face-to-face performance assessments and incentives to local government officials at the Kinondononi Municipal Council in Tanzania. Problems of motivation of civil servants, ways of correcting management.

Рубрика Менеджмент и трудовые отношения
Вид статья
Язык английский
Дата добавления 09.08.2021
Размер файла 35,4 K

Отправить свою хорошую работу в базу знаний просто. Используйте форму, расположенную ниже

Студенты, аспиранты, молодые ученые, использующие базу знаний в своей учебе и работе, будут вам очень благодарны.

Размещено на http://www.allbest.ru/

Local Government Staff Performance Management in Tanzania: Experience of Open Performance Review and Appraisal System (OPRAS) in Kinondoni Municipal Council

P. Mtasigazya

Department of Social Studies, TheMwalimuNyerere Memorial Academy- Karume Campus,

Zanzibar, Tanzania

The article presents a study that examined the effectiveness of the implementation of OPRAS on local government staff performance in the Kinondoni Municipal Council (KMC) in Tanzania. The study adopted a case study research design and used questionnaires, in-depth interview and documentary review in data collection. The Sample size was 100 respondents selected through purposive sampling and the content analysis and cross tabulation methods were used in data analysis. The major study findings indicate that there was a weak implementation of OPRAS because there was no communication of the needs for OPRAS to employees, provision of OPRAS related training, and motivations to public servants were inadequately addressed. Furthermore, in local government authorities (LGAs) particularly KMC, there has been very little concern, demonstrated by inadequate funds and mechanisms put in place that ensure its implementation is effective and sustainable. In regard to this, the findings demonstrated an absence of viable efforts in terms of plans and strategies set to establish an effective and sustainable implementation of OPRAS in the KMC. The financial constrains caused by the absence of a specific budget for OPRAS implementation, laxity of the management in monitoring the implementation of OPRAS in the KMC, as well as inadequate funds disbursed by the central government to KMC are the major factors restraining the effective implementation of OPRAS in the KMC. It is therefore concluded that there is a need for the government to strictly adhere to the processes required in the implementation of OPRAS, such as communicating the need for OPRAS to public servants and setting adequate funds for OPRAS tobe conducted.

Keywords: open performance review, performance appraisal, local government staff performance, management.

Управление работой персонала местного самоуправления в Танзании: опыт очных оценок производительности и системы поощрений в муниципальном совете Кинондони

П. Мтэзигэзья

Академия МвалимуНьерере, кампус Каруме, Танзания

Рассматривается эффективность внедрения очных оценок производительности и системы поощрений (OPRAS) в работу сотрудников местных органов власти в муниципальном совете Кинондони(KMC) в Танзании.

Для сбора данных использовались анкеты, глубинные интервью и документальный обзор. Размер выборки составлял 100 респондентов, а при анализе данных использовались методы контент-анализа и перекрестных таблиц. Основные результаты исследования показывают, что внедрение OPRAS было слабым из-за отсутствия информирования сотрудников о потребностях в OPRAS, проведения обучения, связанного с OPRAS, и недостаточного внимания к мотивации государственных служащих. Более того, местное самоуправление, особенно KMC, было очень слабо заинтересовано в том, чтобы его реализация была эффективной и устойчивой, о чем свидетельствует недостаток выделенных средств и установленных механизмов.

Результаты показали отсутствие реальных усилий с точки зрения планов и стратегий, установленных для обеспечения эффективного и устойчивого внедрения OPRAS в КМС. Финансовые ограничения, вызванные отсутствием специального бюджета для внедрения OPRAS, слабость руководства в мониторинге внедрения OPRAS в КМС, а также недостаточные средства, выделяемые центральным правительством в КМС, являются основными факторами, сдерживающими эффективное внедрение OPRAS в КМС. Таким образом, можно сделать вывод о том, что правительство должно информировать государственных служащих о необходимости OPRAS и выделять средства для ее внедрения.

Ключевые слова: открытая оценка производительности, оценка результатов деятельности, эффективность работы персонала местного самоуправления, управление.

Introduction

performance management motivation

Open Performance Review and Appraisal System (OPRAS) originated from the performance management system (PMS) which existed worldwide, after the reforms that took place before 1950s in organizations, being used as a tool of the performance appraisal system which continued to be a subject of importance and interest among human resource specialists. Due to such importance, the research on performance appraisal has been carried out in developed countries, particularly the United States and some parts in Western Europe [1].

Following the continued use of the performance management system worldwide and its introduction in Tanzania in late 1980s, led to implementation of a number of reforms such as the civil Service Reform Programme (CSRP) from 1991-1998 and later the public service reform programme (PSRP) in 2000. The PSRP came with the introduction of OPRAS in 2004 as a new innovation for managing individual performance in the public service institutions. The PSRP incorporated the use of OPRAS as one of the major instruments for implementation of the Performance Improvement Model which was considered as a significant model to the adoption and nurturing of the performance management in the public Service [2].

In the context of public service reforms in Tanzania, the last decade of the 20th century experienced introduction of public sector reform programmes inclined to the doctrines of the New Public Management (NPM). The Civil Service Reform Programme (CSRP) launched in July, 1991 and implemented at the onset of 1993 up to 1998, focused at cost containment and restructuring of government. With downsizing, rightsizing, retrenchment, and restructuring, the CSRP strived at creating a reasonably smaller, affordable, well-compensated, efficiently and effectively performing civil service for quality service delivery to the public [3].

The CSRP was succeeded by the Public Service Reform Programme (PSRP) which is implemented in a series of overlapping but mutually supporting phases [3]. The PSRP launched in 2000 has up to date been implemented in three distinct phases. The first phase that was implemented from 2000 to 2007 embarked on the installation of Performance Management Systems (PMS) in all MDAs, Regional Secretariats and LGAs. The main objective of this phase was to improve accountability, transparency and resource management for efficient and effective delivery of quality services to the public [4]. The second implementation phase of the PSRP that commenced from 2007 to 2012 targeted at enhancing performance and accountability while the on-going third phase of its implementation commenced from 2012 and lasted in 2017 which is envisioned on quality improvement cycle [3].

Under the theme of improving accountability, transparency and resource management, the government of Tanzania introduced public service reform through the PSRP. According to Issa, the installation of PMS in the public service aims at having a place predictable, effective and efficient system for planning, implementation, monitoring, evaluation and reporting in the public service in Tanzania [3, p. 5]. The overall objectives of these interventions, among other things, include the following: (a) providing quality services to the public, (b) improving performance of the public service institutions. The Open Performance Review and Appraisal System (OPRAS) as an open, formal, and systematic procedure designed to assist both employers and employees in planning, managing, evaluating and realizing performance improvement in the organization with the aim of achieving organizational goals. OPRAS has the following unique features that can be differentiated from the previous confidential appraisal system: openness of OPRAS allows both employee and employer to discuss and agree on the organizational and individual objectives that are to be achieved during the year openly [4].

The introduction of OPRAS in the Tanzania public service in July, 2004 had its roots in the PSRP (I) which installed PMS for the purpose of improving accountability, transparency and human resource management in search for good performance and quality service delivery in the public service. The overall objective of introducing OPRAS was to build an integrated system for creating a shared vision, understanding and agreement about the results to be achieved and the operational framework for continuous performance improvement standards and quality of public service delivery [2].

The installation of OPRAS in Tanzania replaced the traditional Confidential Performance Appraisal System (CPAS) which failed to promote performance improvements and accountability in the public service due to its inherent weakness in providing performance feedback and its inherent inability to identify employees' real strength, weaknesses and opportunities. The CPAS failed to capture a consistent and rationally designed framework for employees' training needs and promotions, thus, contributed to increased employees' complaints and grievances [4].

Furthermore, OPRAS is contended to be so instrumental in determining employees' eligibility for training and development, promotions, demotions, performance-based disciplinary actions and termination [5]. It offers a consistently rational and scientific process of identifying employees' capabilities, opportunities and the magnitude of the gaps for immediate intervention, thus, reducing employees' complaints and grievances as compared to the traditional closed system of appraising employees.

In building a well committed, accountable and result-oriented workforce in the public service, OPRAS was introduced as a performance measurement instrument by the government aiming at installing a performance oriented culture, behavior and attitudes among public servants for the purpose of improving performance in the public service. Such reform would ultimately facilitate a self-motivated and result-oriented performance management philosophy for improved accountability and responsiveness, efficiency and effectiveness in rendering quality services to the public [5].

Since July, 2004 the implementation of OPRAS in the Tanzania public service was, and still is, made mandatory for all MDAs, Regional Secretariats and LGAs through an establishment circular No. 2 of 2004 backed up by the Public Service Management and Employment Policy of 1999, Public Service Act No. 8 of 2002 and the Public Service Regulations of 2003 with their amendments [4]. The fact that OPRAS was installed in the public service in reform dimensions, it is therefore imperative to assess the process involving its implementation in the light of performance management, an aspect that has not been considered by other studies. Such a gap has left the problems facing its implementation uncured thus reducing the possibility of attaining its expected outcomes.

In this regard, it is more than a decade since OPRAS was introduced in the Tanzania public service since July, 2004 to 2020. The main purpose of introducing ORAS is to promote performance management that aim at advancing employees' performance towards improved public service delivery. The implementation of OPRAS could have been successful, thus, enabling assessment of its contribution to improved public service delivery in LGAs in Tanzania. However, experience indicates that the implementation of OPRAS in the Tanzania public service is yet to bring desired outcomes in LGAs [6]. More significantly, the assessments done on the implementation of OPRAS in Tanzania acknowledges that there exists a mismatch between the anticipated results and actual implementation of OPRAS in the course of service delivery in the public in LGAs. In that regard, the main focus of this paper is therefore to examine why is the implementation of OPRAS in the Tanzania public service not effective? Following the adoption of this tool in the performance management, this study attempted to explore the above stated gap by assessing the implementation techniques employed and exploring the challenges encountered in its implementation in public service at KMC. This paper therefore sets out to deal with the following research objectives:-i.to examine the rationale for ineffective implementation of OPRAS in the public service delivery in KMC in Tanzania, ii.to explore the challenges hindering implementation of OPRAS in KMC in Tanzania. The research questions thought to be answered are: Why is the implementation of the OPRAS in local government Authorities in Tanzania particularly KMC not effective as well as what are the challenges constraining an effective implementation of OPRAS in the public service?

Empirical literature review

Effective OPRAS implementation means the degree to which objectives of OPRAS are achieved and targeted problems related to OPRAS are resolved. Around 1980s to date, the public sector in many countries around the world has been experiencing public sector related reforms inclined to the NPM doctrines. Most of the reforms undertaken targeted at building a result-oriented management system that would facilitate performance improvement to improve public service delivery. In particular, Tanzania started undertaking reform initiatives to improve service delivery in the public sector since the last decade of the 20th century. This period is marked by CSRP and PSRP launched in 1991 and 2000 respectively. In the context of these reforms with specific inference to the PSRP, the most remarkable reform undertaken in Tanzania is the introduction of OPRAS in July, 2004. This paper presents a detailed review of related literature on the discourse of performance management and deeper understanding on how OPRAS ought to be managed effectively and sustainably implemented. Nevertheless, a comparative experience with implementation of OPRAS is also discussed in this study.

OPRAS forms' components and filling process

OPRAS is an acronym for the words “Open Performance Review and Appraisal System”. It is an open, formal and systematic procedure designed to assist both employers and employees in planning, managing, evaluating and realizing performance improvements in organizations with the aim of achieving organizational goals [4]. OPRAS requires supervisors and employees to critically develop commonly agreed performance objectives, targets as well as performance criteria.

Generally, OPRAS form is a document composed of eight (8) sections. Section one captures the general information of employees and their institutions. Section two is about performance agreement which is to be filled by the appraisee in consultation with the supervisor. The main parts of this section are the agreed objectives, agreed performance targets, agreed performance criteria and the agreed resources. Section three focuses on the mid-year review (dealt in December) aiming at seeing the progress toward meeting the targets and identifying the factors affecting performance. On the other hand, section four focuses on revising objectives if there is a need while section five focuses on annual performance review which is done in June.

Section six of the OPRAS forms contains attributes of good performance that are used in assessing employees. These attributes include working relationships, communication and listening, management and leadership, quality performance, responsibility and judgment, customer focus, loyalty, and integrity. Section seven shows the performance grades while section eight presents the relevant rewards, developmental measures and/or sanctions that an employee deserves from the grades he/she gets after being assessed.

According to the Standing Orders for the Public Service (2009), employees are required to fill OPRAS forms every 1st July of each year. The guidelines purport that, the process of filling OPRAS forms requires employees and their respective supervisors to commonly agree on the performance objectives, targets and criteria in order to attain the desired goals. After filling the OPRAS forms on 1st July, a mid-year review is done in December to check the level of progress in accomplishing the commonly agreed objectives. Finally, an annual review is done in June to assess the implementation status of the agreed objectives and other individual attributes as directed by the guidelines. The final performance assessment grades that are subject to rewards, developmental measures or sanction as described in the OPRAS guidelines are, however, rated within five indicators of performance. The first grade implies an outstanding performance while the second-grade stands for performance above average, and the third grade indicates average performance. Nevertheless, grade four stands for poor performance while grade five implies very poor performance.

Performance management practices

In pursuit of performance improvement for quality service delivery in the public sectors, New Public Management (NPM) emphasizes on the adoption of private sector practices in public institutions (Furthermore, academics and practitioners continue to arrive at conclusions about performance management based on erroneous or obsolete information [7]. The NPM model shifts the emphasis from traditional public administration to public management and entrepreneurship, pushing public sectors towards managerialism for public service improvements in the public sector [7].

Many countries in Africa as contended by Waal, have been implementing PMS with varied level of success [8]. A study by Mothusi, on the installation of PMS in Botswana for example provides a clear background on the reform management practices in African countries. Mothusi adopted Kurt Lewin's Field Force Analysis in assessing the implementation of PMS in Botswana in a change perspective. The study adopted a case study design focusing on four government departments in Botswana: two from the Ministry of Local Government and two from the Ministry of Lands and Housing [9].

Findings from that study reveal reform management in Botswana through installation of PMS is not effective. One of the most challenges highlighted by Mothusi in the study is that the adoption of top-down approach has been a challenge towards effective implementation of PMS in Botswana. Also, findings confer that an ineffective implementation of PMS in Botswana was caused by inadequate training among staff and negative attitude as there are staff who simply do not want to embrace PMS as it is not important as articulated. Nevertheless, lack of commitment of the management in the implementation of such PMS has been contributing to inadequate attainment of the desired change in Botswana.

However, the gap that exists between this study and that by Mothusi lies in the context at which the two studies are conducted and the type of PMS adopted in analyzing change. It is beyond reasonable doubt that Tanzania and Botswana are two different countries thus the findings obtained in Botswana cannot be generalized in Africa and Tanzania in particular. In that regard therefore, this study remains significant in exploring and assessing the rationale for ineffective implementation of OPRAS in Tanzania public service and the challenges facing it.

In Tanzania public service, a strategic effort for performance management dates as far back to the year 2000 when performance management systems were introduced under the PSRP (I). A more pronounced effort towards effective performance management anchored upon NPM and change initiatives was undertaken through an introduction of OPRAS in July, 2004 for enhancing performance in the public sector [6; 10]. OPRAS was introduced through an establishment of circular No. 2 of 2004 and made mandatory to all MDAs, Regional Secretariats and LGAs. It is further noted by Issa, that the implementation of OPRAS in the Tanzania public service is anchored upon policy and legal framework [6]. The rationale for introducing OPRAS in the Tanzania public service was to cultivate a performance by developing a result-oriented management philosophy among employees that could transform employees' performance behavior and attitudes for quality service delivery [11].

Since OPRAS was introduced in the public service in Tanzania, the government has been struggling to ensure that there is an effective implementation of OPRAS to meet the targeted objectives which is changed performance-culture for public service improvements. However, experience reveals that the implementation of OPRAS in the Tanzania public service is yet to be sustainably effective [10; 12]. As Waal noted, many Countries have experienced performance management initiatives but most of these were limited to the introduction of performance-oriented staff appraisal systems. These have not been very successful because in these systems, promotions are linked to performance while in many developing countries promotion is still linked to seniority or relations [8]. Furthermore, Mishra adds that performance appraisal is perceived by employees as more accurate and more reflective of their performance. They are thus considered as quite effective in providing comprehensive information [1].

Most of the studies conducted to evaluate the implementation of OPRAS in the Tanzania public service reveal that its implementation has not been in a desirable state thus the outcomes expected may not be attained. Laanyuni, for example conducted a study to assess the extent by which OPRAS is effectively been implemented in Mainland

Tanzania specifically in the four ministries namely the Ministry of Finance and Economic Affairs (MoFEA), Ministry of Health and Social Welfare (MHSW), Ministry of Agriculture and Cooperative (MOAC) and the Ministry of Infrastructure Developments (MID) [13]. The findings from this study indicate that OPRAS has not been effectively implemented and that its implementation was not understood with sufficient clarity and consistency among these Ministries. The gap underlying the above findings in relation to this study lies within the setting under which the two studies are conducted and the theoretical perspective guiding them. Unlike the fore mentioned, this study was conducted in the local government authority and it employed the performance management in assessing the implementation of OPRAS. Furthermore, in Kenya, research by Muli sought to determine the impact of performance appraisal on secondary school teacher professional development in Kitui West District [14]. Apparently, none of the studies have been done to investigate the implementation of OPRAS to Local government staff performance. Therefore this study sought to fill the gap using KMC as a case in point.

Research methods

This study employed both qualitative and quantitative research methodologies in collecting and analyzing information to illuminate coherence in discussion and conclusion. However, this study holds that, the best research is that which involves a combination of these methodologies.

The study area for this study was KMC which was purposefully selected among 169 LGAs in Tanzania. The reason behind this selection was based on the following reason: The assessment reports on OPRAS implementation status in the Tanzania LGAs by the Tanzania Public Service Commission (TPSC) reveals that KMC is one of those councils that were not performing well [5]. This has attracted attention to the researcher to investigate ineffectiveness of OPRAS implementation in KMC in Tanzania.

The target population for this study through which data were collected was basically the KMC staff. The data were collected from a total number of 100 respondents of whom 10 respondents constituted the Heads of Departments (HODs) whose responsibilities is to ensure OPRAS is effectively implemented in their respective departments and 90 respondents constituted ordinary staff. The 10 heads of departments were purposefully selected given the number of employees they supervise. Table 1 below presents the sample size and its composition.

This study employed purposive sampling technique in selection of respondents who were ordinary staff and heads of departments. This was done mainly to enable the study have a good and reasonable number of respondents to represent the whole council.

The methods of data collection were an in-depth interview was employed to collect data from 10 heads of departments at KMC who were picked from 10 purposively selected departments in order to obtain detailed information for the study. An in-depth interview was adopted to HODs for the purpose of collecting adequate information from them as they are the one responsible for ensuring that OPRAS is effectively implemented in their respective offices. Furthermore, questionnaires were administered to collect data from 90 ordinary staff respondents selected purposively from 10 departments as listed in Table 1 and explained above. The application of this method in collection of data was important in reaching a large number of respondents in a short period of time. On the other hand, the usage of questionnaires helped in collecting the quantifiable data for this study. Similarly, various documents were reviewed to facilitate a deeper understanding to the matter in question. Documents reviewed include but not limited to the following: government reports, guidelines on the implementation of OPRAS and other relevant information obtained from the council related to the topic under the study.

Table 1. Sample distribution and sample size

No.

Name of Department

Total No. of respondents

Local

government

staff

Percentage

1

Primary Education Department

40

40

2

Human Resource and Administration Department

20

20

3

Works Department

5

5

4

Health Department

10

10

5

Secondary Education Department

15

15

6

Land and Urban Planning

2

2

7

Agricultural and Cooperatives Department

2

2

8

Community Development Department

2

2

9

Finance Department

2

2

10

Livestock Department

2

2

Total number of respondents

100

100

Source: Field data (April, 2020).

In analyzing the data collected from the field, this study employed both qualitative and quantitative analysis. Content analysis was adopted in analyzing the data obtained from documentary review, in-depth interviews and cross tabulation was used in data collected through questionnaires. Under Content analysis technique, data were systematically classified into defined categories comprising patterns of related information sub-themes. For instance, rationale for ineffective implementation of OPRAS was classified into their sub-categories such as abysmal communication of OPRAS to the employees. This method of data analysis facilitated the making of inferences from the qualitative data. On the other hand, with the aid the Statistical Package for Social Sciences (SPSS), descriptive statistics (tabulation) technique and cross-tabulation were used to analyze the quantitative data that were mainly obtained from questionnaires.

Presentation and discussion of the findings

Respondents' socio-economic characteristics

Respondents' age

From the data collected, 5 (5 %) of the respondents belong to the age group below 30 years and 90 (90 %) respondents belong to the age group between 30 to 45 years while the remaining 5 (5 %) respondents were above 45 years. Table 2 below presents the age categories of the respondents as well as the number of respondents and their respective percentages. The findings gives the impression that most of respondents were aware of the challenges in the implementation of the OPRAS since it started in 2004 to 2020.

Table 2. Respondents' age distribution

S/N

Age categories of respondents

No. of respondents

Percentage

1

Below 30 years

5

5

2

Between 30 to 45 years

90

90

3

Above 45 years

5

5

Total number of respondents

100

100

Source: Field data (April, 2020).

Respondents' gender

The data collected on respondents' gender indicates that 50 respondents which is equivalent to 50 % are male while 50 respondents which is equivalent to 50 % are female. Table 3: below shows respondents' gender in terms of frequency and percentages as demonstrated above. The findings in this study indicate that both male and female respondents perceived that OPRAS was not communicated to the employees regardless of their gender. (See table 3 below.)

Table 3. Respondents' gender

S/N

Gender

Frequency

Percentage

1

Male

50

50

2

Female

50

50

Total

100

100

Source: Field data (April, 2020).

The findings of this study differ from Dimeglio, who notes that using content analysis of individual annual performance reviews, shows that women were 1.4 times more likely to receive critical subjective feedback (as opposed to either positive feedback or critical objective feedback to men).This was due to the fact that annual evaluations are often subjective, which opens the door to gender bias [15].

Respondents' level of education

The data collected on respondents' level of education portray that 52 (52 %) of the respondents are degree holders and above, and 48 (48 %) were diploma holders. The education level of respondents was very necessary in this study in order to get views and opinions from respondents with different levels of education.

Respondents' working experience

Under this aspect, the data collected indicate that none of the respondents had served for the public service for the period ranging from 6 months to 2 years and 12 % had served for a period ranging from 3 to 6 years. On the other hand, 27 % of the respondents had served for a period ranging from 3 to 6 years while 48 % had served for from 7 to 10 years and 40 % of respondents served for more than 11 years. Table 4 presents the respondents' years of public service in terms of frequencies and percentages. The findings indicate that there were majority of employees i. e. 88 respondents as presented in table 4 had working experience of more than 7 years that could help to provide valid information about OPRAS at KMC which indicates that the data were collected from respondents with vast working experience with regard to OPRAS.

Table 4. Respondents' years of working experience

S/N

Duration of working experience

Frequency

Percentage

1

6 months to 2 year

00

00

2

3 to 6 years

12

12

3

7 to 10 years

48

48

4

11 years and above

40

40

Total number of respondents

100

100

Source: Field data (April, 2020).

Assessing OPRAS institutionalization process in the public service

This section presents, analyzes and discusses the findings based on the first objective that aims at assessing OPRAS implementation process in the public service. However, the analysis focuses on communicating the rationale for implementing OPRAS to the employees, inspiration of employees to implement OPRAS, involvement of employees in implementing OPRAS at KMC, OPRAS training to employees, OPRAS incentives and motivation to employees.

Communicating the needs for OPRAS at KMC departments

Communicating the need for OPRAS is explicitly one of the important aspects ought to be considered in introduction of the OPRAS. In this study, a question was set to explore employees' opinion on the extent to which the rationale for introduction of OPRAS in the public service was communicated to the public servants as one of the key aspects in the process of introducing public sector reform.

Table 5 presents the responses on the extent to which the needs for the introduction of OPRAS in the public service were communicated to employees in at KMC.

S/N

Responses

Frequency

Percentage

1

Very sufficiently communicated

10

10

2

Satisfactorily communicated

25

25

3

Inadequately communicated

50

50

4

Not communicated

10

10

5

Do not know

5

5

Total number of respondents

100

100

Source: Field data (April, 2020).

The findings presented in table 5 above indicates that 50 (50 %) of the respondents reported that the objectives for the introduction of OPRAS in the public service were inadequately communicated among KMC employees, 10 (10 %) argued that such objectives were not communicated at all. Moreover, the other 10 (10 %) respondents contented that the objectives were sufficiently communicated while 10 (10 %) respondents argued that the objectives were very sufficiently communicated. The remaining 5 (5 %) of the respondents said they do not know anything about the OPRAS.

From the data presented above, findings demonstrate that the need for the introduction of OPRAS in the public service was inadequately communicated among public servants in the KMC. This is demonstrated by 50 % as it evidently appears in the table 5 above. The most contended reason as to why the need for the introduction of OPRAS at KMC was inadequately communicated among employees in the KMC as provided by the management was strongly tied to inadequate financial resources for disseminating such performance evaluation tool. For instance, in 2009/2010, the budgeted amount to be collected was Tshs. 5,052,573,979.00/= but the actual amount was Tshs. 3,914,141,219.00/=, equivalent to 77 % and in 2013/2014, the budgeted amount to be collected was Tshs. 62,661,106,227.66/= but the actual amount was Tshs. 34,187,515,338.99/=, equivalent to 55 % (KMC's Revenue Collection Reports from 2008/2009 to 2017/2018). The findings corroborate with dimeglio, who notes that training appraisers give feedback about specific criteria that the employer and employee agree too may not be successful due inadequate funds [15].

Inspiring employees to embrace OPRAS

In assessing OPRAS implementation process in the public service, a question was also set to explore the extent to which employees were set ready to embrace the application of OPRAS in the public service. The basic assumption was that organization members would embrace and implement well the OPRAS if they are highly inspired to do so by the management.

The Findings presented in Table 6 indicate that, 90 (90 %) of the respondents argued employees were insufficiently inspired to eagerly embrace the application of OPRAS at KMC while 2 (2 %) commented that employees were not inspired at all. On the other hand, 2 (2 %) contended that employees are sufficiently inspired, and 2 (2 %) argued employees are very sufficiently inspired to embrace the implementation of OPRAS. The remaining 4 (4 %) respondents argued they do not know.

Table 6 below presents the findings in summary.

S/N

Responses of respondents

Frequency

Percentage

1

Very adequately inspired

2

2

2

Sufficiently inspired

2

2

3

Insufficiently inspired

90

90

4

Not inspired at all

2

2

5

Do not know

4

4

Total number of respondents

100

100

Source: Field data (April, 2020).

The finding presented in table 6 indicate that employees in the KMC are insufficiently inspired to eagerly embrace the application of OPRAS in the public service with particular inference to the KMC as demonstrated by 90 % of the respondents. Basically, any reform initiative in an organization needs to seek support from organization members. In other words, no institutional and legal reform in an organization can be successful without getting support from the organization members. Such support is only possible where there are serious initiatives undertaken to inspire organization members to eagerly embrace such reform.

Furthermore, Piderit notes that the success of any public sector reform initiative in an organization depends on the extent to which organization members are set ready to welcome such changes [16]. Experience demonstrates that no reform in organizations have been successful without support from organization members. An insufficiency degree of inspiring employees to eagerly embrace the application of OPRAS in the public service demonstrated by the findings which suggest a weak implementation of OPRAS in the KMC. In that regard, the implementation of OPRAS in the KMC may be susceptible to various forms of resistance from employees.

These findings do not corroborate with URT which notes that importance of process which promotes individual accountability, improved transparency and communication between management and employees [17]. The study disagree with Down, which notes that sense of ownership and the understanding of appraisal process are noted as a factor in making an appraisal system more effective [18]. Therefore, for effective implementation of OPRAS, it is important for supervisors and supervisee to set and agree together on the objectives to be accomplished on such specific period.

Involvement of employees in implementing OPRAS at KMC

In examining the involvement of employees in implementing OPRAS in the public service, one question was asked to respondents: intending to identify the extent they were involved in decisions related to OPRAS implementation in the public service. The findings indicate that, 65 (65 %) of the respondents said that employees were not involved in decisions related to OPRAs implementation and 20 (20 %) respondents had the view that they were not involved in decisions related to OPRAS implementation. On the other hand, 15 (15 %) said that they did not know about OPRAS implementation.

Table 7 below presents the findings in detail.

S/N

Responses

Number of responses

Percentage

1

Employees were involved in decision related to OPRAS implementation

20

20

2

Employees were not involved in decisions related to OPRAS implementation

65

65

3

Do not know

15

15

Total number of respondents

100

100

Source: Field data (April, 2020).

Inferring from the findings as shown above, it is noted that employees were not involved in implementing OPRAS instead OPRAS was dictated to them by the government in implementing and such approach was perceived inappropriate by employees in ensuring employees compliance as demonstrated by 65 (65 %) of the respondents. However, studies in the field of performance management indicate that lack of participation in implementation of reforms does not conform to the new practices in the today's organizations characterized by democratic practices demonstrated in the information-rich and knowledge-intensive environment [19]. In similar case, these findings contravenes with the OPRAS implementation guideline stated in URT which notes that “OPRAS involves employees in the process of setting objectives, performance targets and criteria as well as determining, assessing and recording performance” [4].

OPRAS Training to employees in KMC

Since reforms in organizations are associated with training focusing at exposing organization members to the new values and practices of doing business, the introduction of OPRAS imperatively demands intensive training to employees for a successful and sustainable application. In that regard, a question was set to explore the extent OPRAS related training is provided to KMC employees in the course of its implementation. From the data collected, findings give impression that, 50 (50 %) of the respondents revealed that there was no training provided to employees by the KMC while 25 (25 %) contended that training was insufficiently provided to employees. Only 10 (10 %) and 15 (15 %) of the respondents argued for sufficient and very sufficient OPRAS training provided to employees by the KMC respectively.

The findings indicate that OPRAS being a new tool of appraising employees' performance in the public service, it appears that, no serious attention has been given to OPRAS training by the KMC management to employees. Since training is conducted for the purpose of enhancing good performance and building employees' capacity on the technical know-how to apply such a system in performing duties assigned, the absence or an insufficiency OPRAS training to employees as demonstrated by the findings which provide a ground predictable for hardships in implementing such a system. Usually, OPRAS related training needs to be offered to the organization members more frequently so as to sharpen their understanding on how the system works. Since the public service keeps on recruiting new members in every financial year, these members need to be oriented to the application of OPRAS regularly. In this regard, OPRAS training need to at least be provided once every financial year to specific groups of employees as it may be required. From the data collected this has not been the case in the KMC.

Moreover, data collected through an in-depth interview from Head of Departments reveals also that OPRAS training to employees in the KMC is not consistently done. As main OPRAS supervisors in their respective departments, 8 (80 %) Heads of departments out of all 10 acknowledged that OPRAS related training is inadequately provided to KMC employees with invariably a couple of reasons such as inadequate funds and lack of commitment to the implementation of the OPRAS.

The findings corroborate a documentary review which included the council MTEF and CBG implementation reports for the past four (4) years (2014/2015, 2015/2016, 2016/2017 and 2017/2018, 2018/2019). The review found out that in the council MTEF as a budget document, no specific budget items relating to OPRAS was budgeted for the whole period of five (5) years though claimed to have been budgeted as a subset within the training items. Thus, this creates discretionary power to the municipal directors to decide what kind of training should be conducted based on the meager fund available. On the other hand, for the past three years the Capacity Building Grants implementation reports showed that OPRAS trainings were conducted to only 102 employees in the administration department for the year 2015/2016. From the documents reviewed including Standing Committees Meetings, for the past four years as identified above no any other OPRAS training was conducted to the KMC employees apart from that of 2015/2016 done to 102 employees in the department of administration.

OPRAS incentives and motivation to employees

Motivation is one of the techniques employed in performance management and the question was set in this study to examine whether the implementation of OPRAS in the public service is associated with any motivation. Table 8 presents the findings in details.

Table 8. Presence of OPRAS related motivation to employees

S/N

Respondents' responses

Number of responses

Percentage

1

OPRAS related motivation was present

20

20

2

OPRAS related motivation was not present

60

60

3

Do not know

20

20

Total number of respondents

100

100

Source: Field data (April, 2020).

From the data presented in table 8 above, 60 (60 %) of all 100 respondents had the view that the implementation of OPRAS in the KMC is not linked to any motivation and 20(20 %) were not aware of whether there are any motivations provided to employees in the process of executing OPRAS while 20 (20 %) contended that the implementation of OPRAS in the KMC is linked to motivation. It was noted that an implementation of OPRAS at KMC was further hindered by poor motivation to employees in implementing it. Lack of motivation such as incentives to the employees who scored excellent performance in the process of implementing such a tool at KMC caused ineffectiveness in implementation of it.

Monitoring and Evaluation of OPRAS execution at KMC

OPRAS execution process demands a high degree of members' commitment in monitoring and evaluating the process. However, monitoring and evaluation is a function of the organization top management. In assessing the level at which OPRAS monitoring and evaluation is done at KMC, this study focused on assessing how committed is the KMC top management in implementing OPRAS. The Table 9 presents the findings in details.

Table 9. Responses on commitment of the Management in supervision of OPRAS

S/N

Responses

Number of responses

Percentage

1

Very committed

10

5

2

Not committed at all

5

10

3

Poorly committed in monitoring OPRAS

75

75

4

Very committed

10

10

5

Do not know

0

0

Total number of respondents

100

100

Source: Field data (April, 2020).

Findings from the table 9 above reveal that 75 (75 %) of the respondents said that that the top management of the KMC is poorly committed in monitoring OPRAS implementation process. On the other hand, 5 (5 %) respondents said that KMC top management is not committed at all in monitoring OPRAS implementation process while 10 (10 %) respondents said that the top management is committed and only 10 (10 %) of respondents said that the top management is very committed in monitoring such implementation. None of respondents said that they do not know.

The findings provided above demonstrate that, there is little attention given by the KMC top management to serious implementation of OPRAS demonstrated by 75 (75 %) marked poor commitment. Principally, no reform can be successful if the implementation of such reform is not seriously monitored. The organization top management as the main supervisors of the reform initiative is responsible for ensuring that it is effectively implemented. In that regard, lack of seriousness in monitoring OPRAS execution by the KMC top management as revealed by the findings above suggest that OPRAS implementation in the KMC is poor as employees need to be supervised for them to implement it well.

Such findings correspond with that of Bana, who notes that the implementation of OPRAS in the Tanzania public service has been patchy with a minimal rate of compliance among public servants and that there is a skeptical role among public servants and the management towards its implementation [10]. This implies that there is little concern in monitoring the implementation of OPRAs in the KMC thus causing hardships in the general implementation process of this tool.

Assessing employees' compliance to OPRAS implementation

In assessing employees' compliance to the implementation of OPRAS in the public service, two key issue areas were explored in this study. At one point the researcher enquired to know whether employees fill the OPRAS forms on time as prescribed in the OPRAS application guidelines and on the other hand it assessed employees' willingness to continue using OPRAS in executing their functions. Focusing on these two issues, the data collected are presented and discussed in details below.

Timely filling of OPRAS forms

Employees' compliance on OPRAS implementation process can be assessed through OPRAS forms filling. In this regard, the study examined whether employees in the KMC fill OPRAS forms on time as prescribed in the OPRAS and Standing Order guidelines and the findings are as displayed in the table 10 below.

Table 10. Responses on timely filling of OPRAS Forms at KMC

S/N

Responses

Frequency

Percentage

1

OPRAS forms were filled on time

5

5

2

OPRAS forms were not filled on time

90

90

3

Do not know

5

5

Total number of respondents

100

100

Source: Field data (April, 2020).

The findings as indicated in the table 10 above reveal that, 90 (90 %) of the respondents argued that employees do fill OPRAS forms on time and 5 (5 %) of respondents said that employees do not fill OPRAS forms on time while the remaining 5 (5 %) of the respondents argued they do not know whether employees fill OPRAs forms on time i. e. on the first of July. In that regard, the findings demonstrate that the level of employees' compliance to OPRAS implementation in KMC is relatively high marked up by 90 %. The findings reveal that OPRAS is being used by the KMC in appraising employees' performance as mandated through an established circular No. 2 of 2004.

On the other hand, findings on the extent employees fill OPRAS forms timely as depicted in table 10 showing that only 5 % of employees being filling OPRAS forms on time reveal that the implementation of OPRAS in the KMC is weak. It is however worth noting that the worthiness of the application of OPRAS whatsoever rests on the extent to which it is applied effectively and that if it is not, then it reduces its meaning. In this regard, such findings reveal that the application of OPRAS in the KMC is weak thus reducing the logic as well as the intended meaning of its application in the public service.

Responses on whether OPRAS is compulsory tool for performance evaluation in KMC

Respondents were asked to identify whether the application of OPRAS in the public service is compulsory or optional tool for performance evaluation. Responses indicated that, 80 (80 %) of the respondents out of all 100 responded that it was compulsory and only 10 (10 %) contended it was optional while the remaining 10 (10 %) respondents said that they do not know. The table 11 below indicates the findings in details.

Table 11. Responses on whether the application of OPRAS is compulsory or optional in KMC

S/N

Item

Frequency

Percentage

1

OPRAS is Compulsory

80

80

2

OPRAS is Optional

10

10

3

Do not know

10

10

Total number of respondents

100

100

Source: Field data (April, 2020).

The findings provided above demonstrate that the application of OPRAs in the public service was mandatory in the public service. In other words, the application of OPRAS is mandatory since its introduction in 2004, it was expected that all employees would have a clear knowledge concerning its application. In that regard, 10 (10 %) of the respondents said that its application is not compulsory and 10 (10 %) respondents said that they do not know which implies that inadequate dissemination of information concerning its application.

OPRAS and decision making on employment matters at KMC

The study also explored the extent OPRAS is being used in informing decision related to employment promotion and staff training in the public service. The findings demonstrated that, 10 (10 %) of the respondents said that they do not know about OPRAS and 70 (70 %) said that the results obtained from OPRAS were not used to inform decision making about local government staff in the KMC. On the other hand, 15 (15 %) of respondents said that OPRAS results are insufficiently used to inform decisions related to employment while 5 (5 %) said that the results are sufficiently applied. Based on the findings of this study, OPRAS in the public service particularly in the KMC is not adequately applied as a tool for decision making in regard to promotions, identification of training needs for employees' carrier development and others related to employment affairs such as motivation.


Подобные документы

  • Organizational legal form. Full-time workers and out of staff workers. SWOT analyze of the company. Ways of motivation of employees. The planned market share. Discount and advertizing. Potential buyers. Name and logo of the company, the Mission.

    курсовая работа [1,7 M], добавлен 15.06.2013

  • Definition of management. The aim of all managers. Their levels: executives, mid-managers and supervisors. The content and value of basic components of management: planning, organizing, coordinating, staffing, directing, controlling and evaluating.

    презентация [414,2 K], добавлен 16.12.2014

  • Company’s representative of small business. Development a project management system in the small business, considering its specifics and promoting its development. Specifics of project management. Problems and structure of the enterprises of business.

    реферат [120,6 K], добавлен 14.02.2016

  • Analysis of the peculiarities of the mobile applications market. The specifics of the process of mobile application development. Systematization of the main project management methodologies. Decision of the problems of use of the classical methodologies.

    контрольная работа [1,4 M], добавлен 14.02.2016

  • The impact of management and leadership styles on strategic decisions. Creating a leadership strategy that supports organizational direction. Appropriate methods to review current leadership requirements. Plan for the development of future situations.

    курсовая работа [36,2 K], добавлен 20.05.2015

  • The primary goals and principles of asset management companies. The return of bank loans. Funds that are used as a working capital. Management perfection by material resources. Planning of purchases of necessary materials. Uses of modern warehouses.

    реферат [14,4 K], добавлен 13.05.2013

  • Types of the software for project management. The reasonability for usage of outsourcing in the implementation of information systems. The efficiency of outsourcing during the process of creating basic project plan of information system implementation.

    реферат [566,4 K], добавлен 14.02.2016

  • About cross-cultural management. Differences in cross-cultural management. Differences in methods of doing business. The globalization of the world economy and the role of cross-cultural relations. Cross-cultural issues in International Management.

    контрольная работа [156,7 K], добавлен 14.04.2014

  • Evaluation of urban public transport system in Indonesia, the possibility of its effective development. Analysis of influence factors by using the Ishikawa Cause and Effect diagram and also the use of Pareto analysis. Using business process reengineering.

    контрольная работа [398,2 K], добавлен 21.04.2014

  • Logistics as a part of the supply chain process and storage of goods, services. Logistics software from enterprise resource planning. Physical distribution of transportation management systems. Real-time system with leading-edge proprietary technology.

    контрольная работа [15,1 K], добавлен 18.07.2009

Работы в архивах красиво оформлены согласно требованиям ВУЗов и содержат рисунки, диаграммы, формулы и т.д.
PPT, PPTX и PDF-файлы представлены только в архивах.
Рекомендуем скачать работу.